Amtrak | Union Station | New Orleans, Louisiana
National Roof Drainage was contracted to remove and replace (8) existing roof drains and piping past the first elbow.
Total Contract $13,800.00 | Completion Time: 12 Hrs
View fullsize

The existing drain.
View fullsize

After laying down the sump pan we cut the roof down to the deck.
View fullsize

The new drain installed and flush on the concrete roof deck.
View fullsize

The existing piping to be replaced.
View fullsize

The new piping and elbow replaced.